
An appeal that was lodged to our planning permission for a Wind Turbine on 6th November 2015 can be viewed below.
There is a download link at the bottom of the page.
Progress at An Bórd Pleánala can be monitored at this link
feel free to email us at ballynagran.energyplus@gmail.com

An appeal that was lodged to our planning permission for a Wind Turbine on 6th November 2015 can be viewed below.
There is a download link at the bottom of the page.
Progress at An Bórd Pleánala can be monitored at this link
What we are hoping to achieve with the project Community benefits – This project is intended to provide stimulus...
Wicklow County Council Ballynagran Small Grant Scheme 2013 (suggested approach for review) The Ballynagran Landfill Community Liaison Committee and...
The purpose: Low-cost energy retrofit availing of local tradesmen The main concern of the Ballynagran Energy Plus Committee is...
These things are pretty easy to do and IMHO are very worthy replacements for acres of text. I put...
A Map of the Ballynagran Basin Area is at the bottom of this post. There is also a download...
Enerpower was engaged to carry out a feasibility study for a proposed wind energy project at Ballynagran. The report...
There will be a meeting to discuss Solar PV at the Beehive one evening early in the new year....
A presentation, by Hubert Laird with Tim Ryan, in Glenealy Hall outlined the planning, finances, stages and the possible...
Ballynagran Energy Plus and The Owner - All Rights Reserved.
Recent Comments